Introduction

Experience always shows that measures to reduce the idle times of your machines are significantly more worthwhile than chasing seconds in the actual machining process. The solution is a stable and exact reference system. This lets you preset away from the machine and then set up the machine with minimum idle time. Quickly and precisely !

Introduction-EDMing

Fitting the machines with the same reference system means that electrodes and workpieces can be moved between the machines without subsequent alignment and checking - One Minute Set-up.

Introduction2-EDMing
Higher productivity, calculation example:
  Conventional setting-up Pallet system
Working time per day 8 8
Setting-up time per day (hours) -4 -0.5
Spindle time per day =4 =7.5
Working days per week x5 x5
Spindle time per week =20 =37.5
Faster payback, calculation example:
  Conventional setting-up Pallet system
Hourly invoicing (Euro) 50 50
Spindle time / week (hours) x20 x37.5
Revenue / week (Euro) = 1 000 =1 875
Capital cost of machine (Euro) 150 000 150 000
Capital cost pallet system (Euro) 0 +10 000
Total capital outlay (Euro) = 150 00 = 160 000
Paybacktime (weeks) 150 85

A reference system minimises setup times

Every minute that can be converted from internal to external setting time increases the spindle time of the machine and with it the productivity of the business.

Big earnings are within your reach

The machine generates revenue when its spindle is turning - and only then.

Work smarter, not harder